EPS@ISEP | The European Project Semester (EPS) at ISEP


The GreenHouse

Project Summary

The project requirements were:

  1. Design, develop and test a small/medium scale greenhouse. The target user segment and the full set of device requirements are to be defined by the team based on the marketing, sustainability and ethical analyses as well as on the needs of the client.
  2. Comply with the following EU Directives:
    1. Machine Directive (2006/42/CE 2006-05-17);
    2. Electromagnetic Compatibility Directive (2004/108/EC 2004 12 15);
    3. Low Voltage Directive (2014/35/EU 2016-04-20);
    4. Radio Equipment Directive (2014/53/EU 2014-04-16);
    5. Restriction of Hazardous Substances (ROHS) in Electrical and Electronic Equipment Directive (2002/95/EC 2003-01-27);
  3. Mandatory adoption and use of the International System of Units (The NIST International Guide for the use of the International System of Units).
  4. Use open source software and technologies.
  5. Keep construction costs of the prototype under 150.00 €.

Participants

Institution: Instituto Superior de Engenharia do Porto

Team N. 4

Team name: Pingun

Students:

  • Alisson Calderon
  • Antonio Martins da Mota
  • Christophe Hopchet
  • Cristina Grabulosa Olivé
  • Mathias Roeper

Panel of Supervisors:

Contents

Contacts

Utilities

Acknowledgements

  • Sponsor (sponsor)
  • Eng.º Vítor Costa Cerqueira, DEE, ISEP (wiki installation and management)
  • Prof. João Correia Lopes, DEI, FEUP (wiki template)

EPS@ISEP Wiki Template 2012-01-15 15:35

QR Code
QR Code start (generated for current page)