EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
start [2017/03/23 10:56] – [Project Summary] team4start [2017/06/15 17:26] (current) – [Participants] team4
Line 6: Line 6:
 [[http://www.isep.ipp.pt/|Instituto Superior de Engenharia do Porto]] [[http://www.isep.ipp.pt/|Instituto Superior de Engenharia do Porto]]
 ===== Project Summary ===== ===== Project Summary =====
-The project requirements are:+The project requirements were:
   - Design, develop and test a small/medium scale greenhouse. The target user segment and the full set of device requirements are to be defined by the team based on the marketing, sustainability and ethical analyses as well as on the needs of the client.   - Design, develop and test a small/medium scale greenhouse. The target user segment and the full set of device requirements are to be defined by the team based on the marketing, sustainability and ethical analyses as well as on the needs of the client.
   - Comply with the following EU Directives:   - Comply with the following EU Directives:
Line 21: Line 21:
 **Institution**: Instituto Superior de Engenharia do Porto **Institution**: Instituto Superior de Engenharia do Porto
  
-**Team N.**4+**Team N.** 4
  
 **Team name**: Pingun **Team name**: Pingun
Line 40: Line 40:
   * Paulo Ferreira (<pdf@isep.ipp.pt>)   * Paulo Ferreira (<pdf@isep.ipp.pt>)
   * Pedro Barbosa Guedes (<pbg@isep.ipp.pt>)   * Pedro Barbosa Guedes (<pbg@isep.ipp.pt>)
- 
-**Client**:  
-  * //Text// 
 ===== Contents ===== ===== Contents =====
  
QR Code
QR Code start (generated for current page)